FF&E, finishes and bathroom pods rolled out room by room to a single locked specification. Whether it is a new-build roll-out or a refurbishment, Prometheus runs guest-room fit-out as a production line: the same sequence, the same quality benchmark and the same finish on every key, delivered to the programme the operator can plan a launch around.
Scope scales with the project, but these four areas are the spine of any guest-room fit-out engagement with Prometheus.
Loose and fixed furniture, fittings and equipment installed to the operator schedule, snagged and protected ready for housekeeping.
Pre-fabricated pods or traditional builds, waterproofed, tested and tiled to a repeatable detail across every room type.
A locked spec and a fixed sequence mean room 401 is finished to the same benchmark as room 101, with no drift across the floors.
Rooms handed over zone by zone, snagged and signed off so the operator can dress and release them to sale in batches.
Yes. We build and sign off a sample room with the operator first, lock the specification and detail, then roll it out across the floors so every key matches the approved benchmark.
Yes. We can install client-procured FF&E to your schedule or procure it as part of the package. Either way we co-ordinate delivery and storage so the install runs without gaps.
Both. Pre-fabricated pods speed up a new-build roll-out, while traditional builds often suit refurbishment where the structure is fixed. We advise which fits your programme and budget.
It depends on access and room type, but the production-line approach is built for pace. We agree a per-floor cadence at the start and hold the rooms to it.
Prometheus delivers across Manchester, the wider North West, Leeds and London as standard, with national schemes on request.
Whether you have a site, a planning consent or just an idea for a hotel, send us the details and we will come back with a route to delivery.